A car showroom with workshop designed as ground and mezzanine floor. Here Ground Floor accommodates front open area for parking and new cars unloading, Big showroom with car display, Car Service Area, Service Workshop, Ramp going towards terrace for new cars storage. Similarly mezzanine floor accommodates office area.
1. 24+ year experience in steel structure field
Founded in 1997 specializing in the design, production and construction of steel structure for agricultural, industrial, commercial and residential applications.
2. Steelwork solutions to meet different requirements
The design can be matched most common needs, from covering a large area for production workshop and warehouse, to small detached structures.
3. Loads for permanent and long-lasting structures
Making design according to the standard loads, to suit most situations. It is the ideal solution for permanent, flexible structures, responding to geographical restrictions in terms of snow loads, wind loads and earthquakes.
Top quality materials used ensure excellent resistance over time, appreciated long-term.
4. Solidity
Their solid, hot-dip galvanized and painted steelwork make it long-lasting and weatherproof.
5. Made in China
Design warranty are covered by a 50-year on the steel structure. Quality management system is certified ISO 9001.
6. Earthquake-resistant structures
Steel structures comply with the Technical Construction Standards, providing important innovations in the seismic design field. Structural weights are much smaller in steel constructions than in traditional ones, with a consequent reduction in seismic forces on structures and an increased seismic action dissipation capacity.
7. Thermal insulation and soundproofing
Walls and roofs are made of sandwich panels, consisting of two layers alu-zinc sheet layers filled with an inner core of polyurethane foam (PUR)/EPS/Rockwool/Glasswool.
8. Easy installation
It is easily self-installed by skilled technical workers using appropriate installation equipment. All kit components have associated codes, used in the installation manual for quick, easy identification.
9. Material ready in 4-6 weeks from your order
One of the major advantages is reduced manufacturing time, materials being ready for shipping within 4-6 weeks from your order confirmation.
10. Deliveries all over the world
11. Complete documentation for installation, shipping
Supply the relevant installation manual and most documents likes architectural drawings, container loading list, certificates of origin, packing lists, etc.
12. Customization on request
If you can not find the solution that best suits your needs, our engineers will design a tailor-made one for you.
13. Greatest attention to packaging details