Views: 703
Author: Qingdao Omiga Construction Engineering Co., Ltd. Publish Time: 2022-07-19
Origin: Site
Bolted Steel Structure Construction occurs when steel fabricators produce finished and painted steel components, which are then shipped to the site and simply bolted in place. This is the preferred method of steel construction, as the bulk of the fabrication can be done in workshops, with the right machinery, lighting, and work conditions. The size of the components are governed by the size of the truck or trailer they are shipped in, usually with a max length of 6m (20ft) for normal trucks or 12m (40ft) for long trailers. Since the only work to be done at site is lifting the steel members into place (with cranes) and bolting, the work at site is tremendously fast. Pre-engineered buildings are an example of bolted steel construction that is designed, fabricated, shipped and erected by one company to the owner.