Some steps are involved in construction of prefabricated industrial buildings like Site Inspection, Planning, Design, Components Fabrication, Installation etc but the most important step is components fabrication, which should be of best quality for gaining and maintaining the standards, endurance and various other benefits of an perfect industrial buildings.
Package |
Steel Pallet packed steel structure |
Delivery Time |
30-45days |
Supply Ability |
20,000ton/year |
Payment Terms |
T/T,L/C |
Main Structure |
Light steel frame |
Secondary Structure |
Galvanized Purlins |
Cladding |
Steel sheeting, steel sandwich panel |
Windows |
Aluminum alloy window |
Doors |
Roller door, Sectional door, Steel door |
Certification |
ISO/CE/SGS/TUV/BV |
Place of Origin |
Qingdao, China |
Brand Name |
XGZ |