Bottled water production workshop includes steel frame, roof and wall facades, window and doors and fasteners.
Portal steel frame is composed of H section steel column, beam and mezzanine system, all these steels are red lead painting, which will be bolted together at construction site.
Facades are covered with alu-zinc steel sheets plus insulation core materials, decorated by aluminum-ally window and steel sliding door on wall sections.
General Bottled Water Processing Flow
- Water Filtration
Water must be free of any contaminants that will be a pathogenic threat to consumers.
- Tank Venting
The air in the storage tank must be free of microorganisms to ensure that the water stored will not be contaminated.
- Carbonation
Carbonation is the step of adding carbon dioxide to a drink. It is used to produce sparkling water.
- Bottle Blower and Bottle Washer
Maintain the quality of the drink and its life.
- Bottle Filler

.jpg)