Availability: | |
---|---|
Quantity: | |
No. | Item | Steel Structure Construction For Warehouse and Workshop | |
1 | Material | Grade | Q235, Q355 |
2 | Produce | Lead time | 30-45days after shop drawing confirmation |
3 | Quality | Certification | ISO/CE/SGS/TUV/BV |
4 | Specification | Building Size | Width * Length * Eave Height |
5 | Main components | Base | Concrete plus anchor bolts |
6 | Main Frame | Steel column and beam: welded H section steels, hot rolled steels Painting & Galvanization |
|
7 | Secondary Structure | Bracing, knee bracing, purlins, roof and wall support, steel pipe | |
8 | Bolt | Galvanized bolt, High-strength bolt, Self-tapping screw | |
9 | Roof & Wall | PU sandwich panel, Rock wool sandwich panel, Fiberglass sandwich panel, Corrugated steel sheet | |
10 | Door | Sliding door, Roller door, Sectional door, Steel door | |
11 | Window | Aluminum alloy window, PVC window | |
12 | Accessories | Skylight panel, ventilators, down pipe, gutter, flashing | |
13 | Surface treatment options | Alkyd painting (grey, white, blue, brown, engineering yellow) Epoxy painting |
|
14 | Application | 1. Steel workshop, warehouse steel structure, steel structure factory, logistics warehouse, hangar, cold storage warehouse | |
15 | 2. High rise steel building solution | ||
16 | 3. Agriculture steel building for animal husbandry, slaughter, feed mill | ||
17 | 4. Commercial steel building for gym, arena | ||
18 | Package & Delivery | Steel pallet in 40GP, 40HC, 40OT |