Cell-phone/Whatsapp: +86-156 1007 5118        terry@xgzbuildings.com   +86-15610075118

Steel Warehouse

Product Category

Keep In Touch With Us

Keep In Touch With Us

Share to:

Hot Dip Galvanized Warehouse Building

Hot Dip Galvanized Warehouse Building
As people pay more and more attention to the quality of building environment and the increasing demand for it, the demand of steel structure industrial workshop is constantly refreshing as one of the infrastructure facilities of modern industrial development.
Availability:
Quantity:
 

5fb884ba3976c

As people pay more and more attention to the quality of building environment and the increasing demand for it, the demand of steel structure industrial workshop is constantly refreshing as one of the infrastructure facilities of modern industrial development.

Data show that the service life of Hot Dip Galvanized Warehouse Building is generally more than 50 years, even more than 100 years, while the service life of reinforced concrete structure workshop is generally about 40 years. As the steel structure has the advantages of reusability which the reinforced concrete structure does not have, so long as the frame steel structure of the Hot Dip Galvanized Warehouse Building is not damaged, its service life can be extended by redecorating.

 

Key Issues in the Construction of Hot Dip Galvanized Warehouse Building:

 

1. Plant structure design

In the process of preliminary design of Hot Dip Galvanized Warehouse Building, priority will be given to the effect of future finished products, and the design plan will be continuously optimized and adjusted by understanding the specific requirements of various departments for the workshop. Through the application of the frame structure, it is possible to ensure that the workshop obtains the largest space during the specific construction process, and improve the space utilization efficiency of the overall construction. In addition, the staff should also focus on the uniformity of the plant design. By setting the column network more reasonably, they can do their best to reduce the difference between the center of mass and the center of stiffness.

 

2. Temperature control of steel structure construction

During the concrete construction of the Hot Dip Galvanized Warehouse Building, the requirements for the surrounding operating environment and temperature are very strict, and suitable materials need to be selected according to the construction conditions. During the construction of Hot Dip Galvanized Warehouse Building, it is necessary to increase the control of the coating temperature to ensure the overall safety of the Hot Dip Galvanized Warehouse Building. If the temperature exceeds the standard range, it is necessary to stop the construction and carry out corresponding measures to keep the temperature within the standard range before the coating can be applied.

5eb4e7c4a7970

 

Qingdao Omiga Construction Engineering Co.,Ltd.

CONTACT US

    Terry Lee
   terry@xgzbuildings.com
   +86-156 1007 5118
   +86-156 1007 5118
   +86-15610075118
   No.17, Changjiang Road, Pingdu, Qingdao,Shandong Provience,China
​Copyright © 2022 Qingdao Omiga Construction Engineering Co.,Ltd. . All rights reserved