Prefabricated Steel Structure Warehouse For Corn Storage

Prefabricated Steel Structure Warehouse For Corn Storage
The steel structure project has the advantages of light weight, high strength and large span.
Availability:
Quantity:
Prefabricated Steel Structure Warehouse For Corn Storage

 

5fb884ba3976c

The Steel Structure Prefabricated Warehouse has the advantages of light weight, high strength and large span. Because of the adoption of polyphenylene oxide foam sandwich panel or veneer and thermal insulation cotton, the effect of heat preservation, heat insulation and separation is achieved. Steel Structure Prefabricated Warehouse has a lot of advantages, but also for building construction cost saving, Steel Structure Prefabricated Warehouse has become one of the steel structure buildings that the public first choose to build.

 

Ensure the construction quality of Steel Structure Prefabricated Warehouse

 

Nowadays, the construction industry is constantly developing. In many buildings, we can find that most buildings use steel structure as the main load-bearing structure, because steel structure is higher than traditional buildings in shape and performance. However, some quality problems are easy to occur in the construction of steel structure engineering. These four points are very important to ensure the construction quality of Steel Structure Prefabricated Warehouse.

1. Cutting raw materials.

The Steel Structure Prefabricated Warehouse will complete the production of parts in the factory. The step of part production is to arrange the parts according to the processing drawings. if the processing quality of the components can not meet the requirements, the next process and operation will be affected to a certain extent, which will also lead to a discount on the quality of the parts. this will further affect the quality of the whole building, so the blanking of the steel structure must be carried out strictly according to the drawings.

2. Welding technology.

There are three main methods to connect Steel Structure Prefabricated Warehouse, one is welding, the other is bolted connection, and the other is rivet connection. However, in the production process of components, welding is the main method, and the quality of welding is related to the whole building. Quality of use, so it must be completely welded, and welding must not be omitted.

3. On-site installation procedure.

The Steel Structure Prefabricated Warehouse is characterized by prefabrication, so installation is an important step of the whole building. Whether the steel structure project is stable or not depends on whether the installation process is correct or not. Once there is a problem with the installation quality, it is not only easy to cause on-site construction accidents, but also make the quality of the whole project more discounted. Therefore, the installation quality is particularly important in the Steel Structure Prefabricated Warehouse.

4. Anticorrosion and fire prevention process.

The fire-resistant and anticorrosive performance of steel structure is very poor, so fire-resistant and anticorrosive coatings should be paid attention to in the process of component processing. Through the protective coating, the purpose of anticorrosion and fire prevention can be achieved. The coating quality is usually the phenomenon of large area peeling off of the film, the sagging of the surface and the uneven thickness of the film, which should be paid attention to in the process of painting.

 

PROJECT CASES

Australian Warehouse

 

 
Qingdao Omiga Construction Engineering Co.,Ltd.

CONTACT US

    Terry Lee
   terry@xgzbuildings.com
   +86-156 1007 5118
   +86-156 1007 5118
   +86-15610075118
   No.17, Changjiang Road, Pingdu, Qingdao,Shandong Provience,China
​Copyright © 2022 Qingdao Omiga Construction Engineering Co.,Ltd. . All rights reserved